日本高清免费一本视频

<th id="qvg4y"><video id="qvg4y"><acronym id="qvg4y"></acronym></video></th>

<nav id="qvg4y"></nav>
<code id="qvg4y"></code>

<nav id="qvg4y"><video id="qvg4y"><progress id="qvg4y"></progress></video></nav>

            1. HIGH RISE PROJECTS

              High Rise Projects

              Meales Concrete Pumping has a compelling track record in servicing long term concrete pumping project work particularly within Commercial and High Rise projects.

              The following are just a few projects that we have completed or are currently working on

              For Major Projects and Dry Hire of Mobile & High Rise Equipment and Solutions, please contact us us or send us an online enquiry.

              PACE OF ASCOT VALE VIC

              Contractor: Pace Development

              Duration: November 2019 - Current

              Revitalising the junction of Mount Alexander Road and North Street, Pace of Ascot Vale will capture the energy of the suburbs. The building comes together with modern materials and textures, as well as soft curves and lush greenery that create a prominent yet appropriate design.

              Equipment Used:
              CIFA PB36A-4ZC Placing Boom

              H HOTEL ON SMITH NT

              Contractor: Halikos Developments

              Duration: Completed 2013

              H on Smith is located on Smith Street in Darwin’s central business district. The hotel is a short distance from the Darwin Convention Centre (DCC), The Esplanade & Mitchell Street – Darwin’s entertainment and nightlife-hub and home to the world famous Crocosaurus Cove. The hotel includes facilities with 186 bedrooms, garden wrapped pool area, restaurant, alfresco dining, rooftop gym, observation platform and on-site parking.

              Equipment Used:
              1 x Schwing 23M Mobile Boom Pump
              1 x Schwing 3500 Trailer Pump

              ARCHER STREET STUDENT ACCOMMODATION TOOWONG QLD

              Contractor: McNab Construction

              Duration: August 2019 - Current

              A new 15 storey student accommodation located in Toowong consisting of 556 student rooms, a rooftop pool deck and cross block link to an overpass which connects to Toowong Village and train station. Suitably located in close proximity to UQ which is 2.5kms away and very close to public transport.

              Equipment Used:

              • Small Line Pump to 47M Boom Pump
              • 1 x 36M Satellite Boom
              • 1 x High Pressure Stationary Pump

              AURA APARTMENTS MILTON QLD

              Contractor: Tomkins

              Duration: April 2019 – Current

              Spanning over 20 levels with 82 apartments, retail tenancies and car parking; Tomkins are proud to present Aura Milton as our newest awarded residential build.

              The complex boasts one, two and three-bedroom apartments, featuring open plan living areas and large private balconies to take advantage of natural light and ventilation. Aura Milton”s apartments will range in size from 66sqm to 196sqm. The exclusive outdoor recreation areas include a lap pool, gym facilities and a rooftop entertainment area with barbeque facilities. After the successful completion of Bastion Apartments, Tomkins are looking forward to building on its relationship with BlueSky on this exciting new development.


              Equipment Used:
              • Small Line Pump to 63M Boom Pump
              • 1 x 28M Satellite Boom

              LOTUS TOWER KANGAROO POINT QLD

              Contractor: McNab Construction

              Duration: May 2018 - October 2019

              A luxury villas apartment and penthouse with an extensive range of resident amenity including a roof top sun deck and spa, swimming pool, dedicated yoga space, a golf simulator and children’s play areas.

              Equipment Used:

              • Small line pump to 52M Boom Pump
              • 1 x 32M Satellite Boom
              • 1 x High Pressure Stationary Pump

              NORTH WEST PRIVATE HOSPITAL QLD

              Contractor: John Holland Group

              Duration: May 2019 - Current

              The expansion, in form of a new wing, is constructed adjacent to the existing hospital building over the existing ground floor open car park. The project also includes internal alterations to Ground Floor, Level 1, Level 2 and Level 3 with the substantial integration of the existing and new on Level 1.

              Equipment Used:

              • Small Line Pump to 52M Boom
              • 1 x 42M Satellite Boom

              today for a quote!

              CONTACT US

              Phone VolumeFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)
              EnvelopeFont Awesome Free 5.0.6 by @fontawesome - http://fontawesome.com License - http://fontawesome.com/license (Icons: CC BY 4.0, Fonts: SIL OFL 1.1, Code: MIT License)

              FOLLOW US

              QUICK LINKS

              CONCRETE PUMPS

              CONCRETE PUMPING SPECIFICATIONS

              PROJECTS

              日本高清免费一本视频
              <th id="qvg4y"><video id="qvg4y"><acronym id="qvg4y"></acronym></video></th>

              <nav id="qvg4y"></nav>
              <code id="qvg4y"></code>

              <nav id="qvg4y"><video id="qvg4y"><progress id="qvg4y"></progress></video></nav>

                      1. ? 2020 Meales Concrete Pumping

                        Fill out the form below and we will be in contact with you shortly. Or call 1300 632 537.